精品人妻少妇一区二区三区,老汉色av影院,国产国语在线播放视频,美女内射毛片在线看3d

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機(jī)的生產(chǎn)與制造

24小時(shí)全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://shishanglu.com

當(dāng)前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺(tái)佑電子 | 作者:臺(tái)佑電子 | 發(fā)表時(shí)間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

亚洲成av人片天堂网| 色窝窝无码一区二区三区| 亚洲欧美日韩综合久久久| 久久久久久国产精品免费免费男同| 亚洲无码一区二区三区| 性久久久久久久| 领导边摸边吃奶边做爽在线观看| 亚洲欧美精品suv| 欧美老妇与禽交| 久久水蜜桃亚洲av无码精品| 小sao货水好多真紧h无码视频| 日本最大色倩网站www| 日韩经典午夜福利发布| 久久久噜噜噜久久中文字幕色伊伊 | 久久99精品久久久久久hb无码| 亚洲 日韩 欧美 成人 在线观看| 久久精品夜色噜噜亚洲a∨| 成人aaa片一区国产精品| 最近最新中文字幕| 日韩欧美中文字幕公布| 又大又硬又黄的免费视频| a级毛片内射免费视频| 人妻去按摩店被黑人按中出| 少妇厨房愉情理伦bd在线观看| 亚洲熟女综合一区二区三区| 亚洲成av人片天堂网无码| 后入到高潮免费观看| 国产成人综合久久亚洲精品| 精品无码av一区二区三区| 97夜夜澡人人双人人人喊| 欧美猛少妇色xxxxx| 少妇无码av无码专区| 亚洲人成无码网站久久99热国产 | 亚洲人成电影在线播放| 欧美精品中文字幕亚洲专区| 99噜噜噜在线播放| av天堂午夜精品一区| 午夜福利电影| 国产av无码专区亚洲av毛网站| 欧洲成人午夜精品无码区久久| 亚洲av无码专区在线播放中文|