精品人妻少妇一区二区三区,老汉色av影院,国产国语在线播放视频,美女内射毛片在线看3d

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機(jī)的生產(chǎn)與制造

24小時全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://shishanglu.com

當(dāng)前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

内射口爆少妇麻豆| 三级特黄60分钟在线观看| 亚无码乱人伦一区二区| 成人亚洲性情网站www在线观看| 亚洲人成在线观看| 精品丰满人妻无套内射| 久久精品国产亚洲av香蕉| 日韩丰满少妇无吗视频激情内射 | 免费av一区二区三区| 手机看黄av免费网址| 久久久无码精品亚洲日韩按摩| 琪琪色原网站在线观看| 少妇无码一区二区二三区| 国产婷婷色一区二区三区| 久久亚洲精品11p| 丰满熟妇乱又伦| 亚洲乱码国产乱码精华| 久久99精品久久久久久齐齐| 久热这里只有精品视频6| 无遮挡亲胸捏胸免费视频| 久久国产精品无码一区二区三区| 欧美黑人性暴力猛交喷水| 中文字幕日韩三级片| 青草青草久热精品视频在线观看 | 无遮挡国产高潮视频免费观看| 日产精品久久久一区二区| 日本丰满少妇xxxx| 精品伊人久久大线蕉色首页| 中文精品久久久久国产网址| 狠狠躁日日躁夜夜躁2020| 日韩精品人成在线播放| 国产成人精品aa毛片| 99无码熟妇丰满人妻啪啪| 国产精品一区二区久久乐下载| 精品乱码一区内射人妻无码 | 无码精品人妻一区二区三区av| 国产欧美精品aaaaaa片| 久久久久人妻精品一区三寸| 豆国产96在线 | 亚洲 | 日韩欧美在线综合网| 香港三级日本三级a视频|